For the EPC's and Developers looking for an alternative to CAB and open trench DC/AC feeder installations, we at Jolma Utilities have the answer! Our vibratory plowing trenchless conduit installation offers the same durability of burying through open trench means of the DC/AC feeders while avoiding all the drawbacks of an open trench (open trench safety concerns (it is trenchless), erosion issues, increased labor hours, extended/delayed schedules, site restoration, and more). Are vibratory plowing installation provides the protection from whatever mother nature throws at your site while cutting 3-4 weeks off of your site's construction schedule which in turn makes it as cost effective as CAB systems which are exposed to many varying types of failure points. So, if you are looking for the best, quickest, and most cost-effective way to install your DC/AC feeders underground give our team at Jolma Utilities a call!